Push Pull Cap Mould
Mould Name | Push Pull Cap Mould |
Product Material | Pp |
Capdia | 50Mm |
Cavity No | 4 |
By Injection Machine | 160 Ton |
Ejection Method | Ejection Pusher |
Push Pull Cap Mould
1.R&D: We support customer R&D. Make the files or improve the design if you needed.
2.Quotation Making: Mould Quotation will be finished in 1 day according to information we get.
3.Negotiation: The quality, price, material, delivery time, payment item, etc.
4.Mould Design: 1-2days for product 3D/2D drawing design as per customer’s design or our company’s design. Then in further make the mould 2D/3D design.
5.Mould: 1. confirm the proucts and the mold design
2. Mould material prepare
3. Rough machining(heat treatment on mold base and pre-harden on mold)
4. CNC/ Vacuum Hardening on mold main spare parts
5. finishing machining( JDPAINT, DEM.etc)
6. Dimension inspection
7. Ejector& runner& cooling & other device process
8. Assemble mold
6.Mould Testing: When moulds are finished, we will test the mould and we will send samples for consumer reference.
7. Sample confirmation: If the first sample is not satisfied by customer when it is come out. We modify the mould and until meet customer’s satisfaction.
8.Delivery: Delivery goods by sea or by air, according to customer’s requirement.
Key points of structure | Drum demoulding |
Cover material | PE or PP, subject to customer’s actual sample |
Mold material | Standard mold frame 50# steel; Cavity/core 2083 |
Acceptance criteria | The size, weight, shape and function should be consistent with the customer’s sample. Other modification parts should refer to the drawing. Cooperate with the bottle leakage, leakage and skid button; Complete function with pull down cover |
Number of molds | No less than 20 per cavity |
Sample color | Subject to customer requirements |
Lettering requirements | Subject to customer requirements |
Drawing requirements | 2D size drawing and 3D drawing (including 3D printed samples) |
Free parts | According to factory list |
Supporting models | 170 tons injection molding machine, 470*470mm, maximum mold thickness 520mm, minimum mold thickness 180mm, the rest refer to the customer’s machine pictures |
Packing | Standard export fumigation-free wooden box or plywood wooden box packing |
Packing mark | Subject to customer requirements |
Warranty time | One year from the date of successful installation and use of the customer |
Aman Mould has been committed to the development and manufacture of bottle two-color cap moulds. Every year, a group of talents and huge R&D investments is introduced, especially in the aspects of precision injection molding, precision machining, fast molding speed, and short cycle. As a result, Aman two-color cap moulds are constantly innovating and improving in the industry and enjoy a high reputation. So far, we have delivered several sets of cap molds, which have been highly recognized by domestic and foreign customers. In addition, Aman can also provide technical support and solutions for mold production lines for the plastics industry.
- Specification
Customized shampoo cap mould, cream jar mould, spray mould, lotion pump mould, comb pump mould, dropper cap mould, baby bottle injection mould and various bottle cap moulds with improved hardness, high-temperature resistance, small deformation and no need for quenching, High surface hardness (greater than HV8500), wear-resistant. The normal use is not less than 2 million times.
Mould Name | Push Pull Cap Mould |
Product Material | Pp |
Capdia | 50Mm |
Cavity No | 4 |
By Injection Machine | 160 Ton |
Ejection Method | Ejection Pusher |
Mold Base | P20 |
Cavity Material | Ass Abs136 |
Core Material | Ass Ab2083 |
Hardness | Hrc 46-56 |
Lifetime | Over 200 Million Times |
Runner | Hot Runner |
Packaging | Exported Standard Wood Carton |
Cover Mold Features
1. Replaceable blades for easy maintenance and extended dead life.
2. Each cavity and core has an independent cooling system, which shortens the production cycle and has high production efficiency.
3. Export standard moulds; We are honest about steel and mould parts.
4. Test the mold and cap before shipping to your country, if it is damaged, we will provide you with spare parts within one year.
5. The tooling machine is from Japan and is good at precision machining to ensure low eccentricity.
The above technical parameters are subject to continual update, please rake the real product as the base.
Related Product
Aman Industry Takes “Faithful And Honest” As Root
Since 2007, our company, Aman Industry has had rich experience over the course of many years, making us the leading expert in the plastic packaging industry. Our seasoned, qualified experts have a diverse range of professional skills.
WHY US
- Full Certification
- Advanced Equipment
- Best Services
First, we received your request for quotation and design files and give you a detailed quotation. Usually, we will give you a quotation within 24 hours.
Once you approve the order, we will start the mold design, it needs about 3 days because, at the beginning of each project, our engineers need to sit together and have a meeting to find the best solution for the mold design.
After finishing the mold design, we will send you a 3D mold assembly drawing for you to check and confirm.
As soon as you confirmed the mold assembly drawing, we will purchase steel material and give you a schedule for your project. After that, we will start mold making. When the mold is finished, we will have the first mold trial and send you some free samples to check and test.
If you think the sample is good, then we will do the mass production as required. And if the samples are rejected, we will modify our molds.
When the production is finished, we will pack the goods and deliver them according to your requirement. Meanwhile, we will send you the packing pictures.
After receiving your RFQ, we will quote the price and send you a detailed quotation sheet. As you can see from this sheet, we will mention the mold cavities, steel material, injection system, mold size, mold weight, mold life, lead time as well as the price.
And about the price, what is important is that this price is valid within a week. Because you know, the material price and the exchange rate change day by day.
During the mold making, we will send you the weekly report each week to keep you noted about the mold progress.
Usually, when sending you the first trial samples, we will also send you an inspection report together for you to check the part size.
If there is something about the sample which are not ok, we will make a note for mold changes or modifications. In this note, we will point out the problem, the relative solution, and the time as well as the time needed.
When we do the mold design, we need to take all this information into our consideration to guarantee the best solution for the mold design.