• Home Appliance Mould
  • Home Appliance Mould
  • Home Appliance Mould
  • Home Appliance Mould
  • Home Appliance Mould
  • Home Appliance Mould
  • Home Appliance Mould
  • Home Appliance Mould
  • Home Appliance Mould
  • Home Appliance Mould

Home Appliance Mould

Core cavity Steel:P20,718H,2738H, H13, etc.
Mould life:500,000 Shots
Steel hardness:HRC35-38
Plastic material:PP,PC,PE,ABS,PVC etc.
Injection System:Side Gate, hot gate
Ejector System:Ejector Pin
Cycle Time:30-60S
Mould life:5M-10M shots

Home Appliance Mould

Aman Mould has been committed to the development and manufacture of home appliance moulds. Every year, a group of talents and huge R&D investments is introduced, especially in the aspects of precision injection molding, precision machining, fast molding speed, and short cycle. As a result, Aman home appliance moulds are constantly innovating and improving in the industry and enjoy a high reputation. So far, we have delivered several sets of home appliance moulds, which have been highly recognized by domestic and foreign customers. In addition, Aman can also provide technical support and solutions for mold production lines for the plastics industry.

Home Appliance Mould
Product NameMulti cavity house hold injection mould
Core &Cavity SteelP20,718H,2738H, H13, NAK80,2316 etc.
Mould base & Standard ComponentDME,HASCO,Self-made etc.
Steel hardness:HRC35-38
Plastic materialPP,PC,PE,ABS,PVC etc.
Injection SystemSide Gate,hot gate
Ejector SystemEjector Pin
Cycle Time30-60S
Tooling lead time45-60 Days
Mould life500,000 Shots

mold offer process(Aman logo )

Customized fruit tray mould, wardrobe mould and various home appliance moulds.

The above technical parameters are subject to continual update, please rake the real product as the base.

Home Appliance Mould

Home Appliance Mould

Home Appliance MouldHome Appliance Mould

Home Appliance Mould

Home Appliance Mould

Home Appliance Mould

Home Appliance Mould

Home Appliance Mould

Aman Industry Takes “Faithful And Honest” As Root

Since 2007, our company,  Aman Industry has had rich experience over the course of many years, making us the leading expert in the plastic packaging industry. Our seasoned, qualified experts have a diverse range of professional skills.

WHY US

  • Full Certification
  • Advanced Equipment
  • Best Services
1. Project management flow chart

First, we received your request for quotation and design files and give you a detailed quotation. Usually, we will give you a quotation within 24 hours.

Once you approve the order, we will start the mold design, it needs about 3 days because, at the beginning of each project, our engineers need to sit together and have a meeting to find the best solution for the mold design.

After finishing the mold design, we will send you a 3D mold assembly drawing for you to check and confirm.

As soon as you confirmed the mold assembly drawing, we will purchase steel material and give you a schedule for your project. After that, we will start mold making. When the mold is finished, we will have the first mold trial and send you some free samples to check and test.

If you think the sample is good, then we will do the mass production as required. And if the samples are rejected, we will modify our molds.

When the production is finished, we will pack the goods and deliver them according to your requirement. Meanwhile, we will send you the packing pictures.

2. Quotation sheet

After receiving your RFQ, we will quote the price and send you a detailed quotation sheet. As you can see from this sheet, we will mention the mold cavities, steel material, injection system, mold size, mold weight, mold life, lead time as well as the price.

And about the price, what is important is that this price is valid within a week. Because you know, the material price and the exchange rate change day by day.

3. Weekly report

During the mold making, we will send you the weekly report each week to keep you noted about the mold progress.

4. Sample inspection report

Usually, when sending you the first trial samples, we will also send you an inspection report together for you to check the part size.

5. Note for mold changes or modifying

If there is something about the sample which are not ok, we will make a note for mold changes or modifications. In this note, we will point out the problem, the relative solution, and the time as well as the time needed.

6. The final one is a sheet about all the details for mold deign

When we do the mold design, we need to take all this information into our consideration to guarantee the best solution for the mold design.

Send Your Inquiry Today
Quick Quote
Scroll to Top