• Car ball cage anti -dust cover special note blowing all -in -one (TPEE raw material)
  • Car ball cage anti -dust cover special note blowing all -in -one (TPEE raw material)

Car Lever Dust Cover Blow Machine

Max. mold width/height(mm)210×220
Longitudinal ratio(L/D)28 :1
Max. length(mm)240
Clamping force(kN)23
Cooling water(℃)10~15
Operating air pressure(bar)4~6
Weight(kg)~4100
Dimension(m)4.1×2.0×2.7
Total installed capacity(kW)40.5

injection blower 750400

 

Configuration

1. BECKHOFF made in Germany PCC control system integrated with 300 points parison control, 15 inch touch panel. Any part of the parison curve can be moved up and down.
2. Fuji inverter and contactor
3. v20CrMnTi high strength alloy gear box
4. The screw and barrel are made of high grade nitridation steel 38CrMOALA, hardened by nitriding
5.High performance Rexroth servo valve made in Germany
6. Imported linear bearing guide
7. FESTO pneumatic finger
8. Painting with top grade automotive painting
Advantage 446400
Aman TPEE IBM Advantage
The car TPEE cage dust cover is blowing the plastic machine. The material tube that is completely opposite to the traditional tube from the bottom to the top is used to set the shape of the thick dot curve and the shape of the ball cage dust cover product. There is a large diameter, and there are many peaks in the middle and the gap between the valley. When the gap between the peaks is very steady, keeping the wall thickness is very uniform, and in order to form an internal thread in the small mouth, the injection molding and blowing plastic are performed at the same time.
Our core competitiveness
1. Our factory integrates the world’s most advanced technology, independently develops, tests, and successfully develops a car. TPEE dust covers the car.
2. In the domestic plastic machinery industry, Aman is the first successful company.
3. Use the dust cover produced by our machine, the wall thickness of the same section at the peak and valley.
4. Realize the automatic production process of automatic product formation, automatic removal, automatic cutting, automatic cutting, and automatic weighing.
5. Our products are very competitive in the international market, because of good machine stability.
6. Low-priced and good after-sales service has won high praise from customers!
Blower for TPEE CVJ boots
TPEE ball cage dust cover performance characteristics
The ball cage dust cover on the speed -oriented section (CVJ) of the car is a car -steering system ball protection for storing lubricating oil and avoiding dust, water and salt into the lubrication system. Performance requirements must have long-term erosion of high and low temperature resistance, fatigue resistance, and heat-resistant oil.
Currently in developed countries such as Europe, the United States, Japan, and South Korea, more than 10 years ago, I used TPEE thermoplastic elastic plastic instead of rubber, because:
① The low temperature and fatigue performance of the TPEE cage anti-dust cover, long-term oil erosion of 100 ° C of 100 ° C, the working temperature range is very wide, which can be used at -70 to 200 ° C.
② TPEE provides more dust cover than CR rubber (club rubber). Such as: recyclable, low population expansion rate.
③ Compared with traditional rubber (corporate), it can reduce the weight by 50%, shorten the molding cycle by 90%, and extend the service life several times (up to 100-300,000 km).
④ The ozone resistance, weather resistance and aging resistance of the cage dust cover.
Serial number
Parameter
Value
1
Screw diameter(mm)
65
2
Longitudinal ratio(L/D)
28: 1
3
Plasticizing capacity(kg/hr)
50
4
Extrusion power(kw)
15
5
Screw barrel heating power(kw)
13.5
6
Die heating power(kw)
4.5
7
Oil pump motor power(kw)
7.5
8
Minimum clamping distance(mm)
160
9
Max. opening distance(mm)
550
10
Max. mold width/height(mm)
210×220
11
Max. material storage capacity(ml)
200
12
Max. diameter of injection molding(mm)
35
13
Max. diameter of blow molding(mm)
130
14
Max. length(mm)
240
15
Clamping force(kN)
23
16
Cooling water(℃)
10~15
17
Operating air pressure(bar)
4~6
18
Weight(kg)
~4100
19
Dimension(m)
4.1×2.0×2.7
20
Total installed capacity(kW)
40.5

Aman Industry Takes “Faithful And Honest” As Root

Since 2007, our company,  Aman Industry has had rich experience over the course of many years, making us the leading expert in the plastic packaging industry. Our seasoned, qualified experts have a diverse range of professional skills.

WHY US

  • Full Certification
  • Advanced Equipment
  • Best Services
1. Project management flow chart

First, we received your request for quotation and design files and give you a detailed quotation. Usually, we will give you a quotation within 24 hours.

Once you approve the order, we will start the mold design, it needs about 3 days because, at the beginning of each project, our engineers need to sit together and have a meeting to find the best solution for the mold design.

After finishing the mold design, we will send you a 3D mold assembly drawing for you to check and confirm.

As soon as you confirmed the mold assembly drawing, we will purchase steel material and give you a schedule for your project. After that, we will start mold making. When the mold is finished, we will have the first mold trial and send you some free samples to check and test.

If you think the sample is good, then we will do the mass production as required. And if the samples are rejected, we will modify our molds.

When the production is finished, we will pack the goods and deliver them according to your requirement. Meanwhile, we will send you the packing pictures.

2. Quotation sheet

After receiving your RFQ, we will quote the price and send you a detailed quotation sheet. As you can see from this sheet, we will mention the mold cavities, steel material, injection system, mold size, mold weight, mold life, lead time as well as the price.

And about the price, what is important is that this price is valid within a week. Because you know, the material price and the exchange rate change day by day.

3. Weekly report

During the mold making, we will send you the weekly report each week to keep you noted about the mold progress.

4. Sample inspection report

Usually, when sending you the first trial samples, we will also send you an inspection report together for you to check the part size.

5. Note for mold changes or modifying

If there is something about the sample which are not ok, we will make a note for mold changes or modifications. In this note, we will point out the problem, the relative solution, and the time as well as the time needed.

6. The final one is a sheet about all the details for mold deign

When we do the mold design, we need to take all this information into our consideration to guarantee the best solution for the mold design.

Send Your Inquiry Today
Quick Quote
Scroll to Top